Physical Plant employees recognized for power outage restoration
March 3, 2017The lights went out across much of the Belknap Campus on Feb. 2 when a backhoe hit a major line. At first glance, it didn’t look like an easy repair. Some even worried it could take months.
The full restoration is still not complete. It may not be until June or July. Nevertheless, campus has power and operations are running as if nothing happened. Physical Plant is to thank for that. When the initial outage happened, the Physical Plant team worked throughout the night to get everything back on track.
Classes were back in session by 10 a.m. the next morning, well ahead of projections. It was a beat-the-odds effort.
On Feb. 23, Interim President Greg Postel, COO Lee Smith and CAO David Adams held an event for the Physical Plant Department to show appreciation for their hard work. The administrators hope to host more of these types of events in the future; though hopefully not stemming from a major power outage.